Author(s): A. Goran Miceta; Uros Karadzic; Luka Milacic; Ljubisa Boskovic; Milos Knezevic
Linked Author(s): Uros Karadzic
Keywords: Water intake structures; Small hydro power plants; Run of river schemes; Lateral intake; Tyrolian intake
Abstract: The objective of this study is the analysis of two different types of water intake structures with similar base parameters. It will address the advantages and disadvantages of both types and decide which is the best of two for the set conditions.
DOI: https://doi.org/10.3850/978-981-11-2731-1_084-cd
Year: 2018