Author(s): E. Fenrich; C. Cimatoribus; B. Bockelmann-Evans
Linked Author(s): Eva Fenrich
Keywords: Tidal barrage; Life cycle assessment; Severn estuary; Renewable energy
Abstract: In this case study different proposed tidal barrage options on the Severn Estuary have been compared using the Life Cycle Assessment software GaBi. With results from this analysis feasible construction and management scenarios can be outlined.
DOI: https://doi.org/10.3850/978-981-11-2731-1_338-cd
Year: 2018