Author(s): M. R. Backiev
Linked Author(s):
Keywords: No Keywords
Abstract: The combined dikes are those having blind root part(to re-duce internal washout depth;local material),and the dikes whosecape are made through on the definite length(the piles).Theyare erected to direct the main part of river consumption to thewater scoop place,to defend the banke and to regulate the riverbed.
Year: 1991