DONATE

IAHR Document Library


« Back to Library Homepage « Proceedings of the 24th IAHR World Congress (Madrid, 1991)

Determination of Hydraulic Roughness During Free Flow of the Partially-Lined Cookhouse Water-Transfer Tunnel

Author(s): J. M. Jordaan

Linked Author(s):

Keywords: No Keywords

Abstract: The Cookhouse Tunnel is a 13,22 km long partially-lined water tunnel 4,63m diameter (where lined) and 5,03 m (Where unlined) which transfers water under free-flow conditions between two adjoining river basins, the Fishand little Fish Rivers, in the Bastern Cape Region of South Africa. It was geologically inspected and hydraulically monitored to determine the causes of deterioration and extent of possible eventual reduction in discharge capacity.

DOI:

Year: 1991

Copyright © 2025 International Association for Hydro-Environment Engineering and Research. All rights reserved. | Terms and Conditions